Hoover Dam from Las Vegas: Tours, Tickets, Parking and Hours

A practical half-day guide to Hoover Dam from the Las Vegas Strip: getting there, the three tours and their prices, hours, parking, security, what to see and Lake Mead's water level.

7 min read

Hoover Dam's four intake towers rising from Lake Mead, with the Mike O'Callaghan-Pat Tillman Memorial Bridge arching behind
Hoover Dam's intake towers and the bypass bridge, with Lake Mead well below its old high-water marks (April 2026). Photo: Christian David, via Wikimedia Commons CC BY-SA 4.0
In this guide

Planning a Hoover Dam tour from Las Vegas? Hoover Dam sits 30 miles southeast of the city, which makes it an easy half day from the Strip. Three paid tours are on offer, from a $15 self-guided visit to a $40 guided tour, and parking is $10.

If you are still choosing where to stay, start with our Las Vegas Strip map with every hotel in order. Details come from official pages checked on October 31, 2026.

How far is Hoover Dam from Las Vegas?

Hoover Dam is 30 miles southeast of Las Vegas. Reclamation's directions page gives the route from the Las Vegas side:

  1. Head south on I-11, US-93 or US-95 through Boulder City.

  2. Take Exit 2.

  3. At the traffic circle, take the third exit onto NV-172, the Hoover Dam Access Road.

  4. Follow the road to the parking garage near the Hoover Dam Visitor Center.

Expect periodic delays, especially during holiday and summer travel. Vehicles pass a security checkpoint on the Nevada side. If you do not have a car yet, our airport to Strip guide covers picking one up, and our getting around Las Vegas guide covers the rest.

Drivers can carry on over the Mike O'Callaghan-Pat Tillman Memorial Bridge into Arizona.

Which Hoover Dam tour should you take?

Hoover Dam tour tickets come in three versions. The Self-Guided Visitor Center Tour is the lowest price and the most flexible. The Guided Power Plant Tour costs more and has a lower price for children. The Guided Dam Tour is the top option, and it is the only one you cannot buy ahead. Reclamation lists all three on its tour information page.

Hoover Dam tours compared

TourPriceHow to buyAges
Self-Guided Visitor Center Tour$15 per personOnline, or upgrade on site3 and under free
Guided Power Plant Tour$25 adults, $15 ages 4 to 16Online, or upgrade on site3 and under free
Guided Dam Tour$40 per personOn site only, in person, first come first served3 and under free

Visitors must be over 16 to go on a tour by themselves. Because Dam Tour tickets are first come first served, arriving early gives you the best chance of getting one.

Hoover Dam hours and tickets

The dam site is open to the public daily from 5 a.m. to 9 p.m. Pacific. The Visitor Center is open daily 9 a.m. to 5 p.m. Doors close at 4:15 p.m. and the last tour departs at 4:10 p.m. The Visitor Center is closed on Thanksgiving and Christmas Day.

Visitor Center and Power Plant tickets are sold online and can be upgraded on site. If online tickets are not available, buy them at the Visitor Center. Dam Tour tickets are never sold online, so plan to buy those in person, with your group, when you arrive.

Parking and security

Hoover Dam parking is $10 per vehicle in the Nevada-side garage near the Visitor Center. RVs, vehicles with trailers and oversized vehicles park on the Arizona side instead: Lot 9 costs $10, and Lots 13 and 14 are free. Not all vehicles may cross the dam, so check Reclamation's Crossing Hoover Dam traveler's guide if you are towing or driving something large.

Everyone is screened when entering the Visitor Center. Firearms, explosives, fireworks, drones and marijuana are prohibited, and knives of any size are not allowed inside buildings. Pack light and leave the extras in the hotel.

What to see at the dam

Vehicle and pedestrian traffic crosses the top of the dam, so the crest is part of the visit. From there you can look out at the four intake towers rising from Lake Mead, and back at the arch of the bypass bridge.

The dam stands 726.4 feet from foundation rock to the roadway on the crest, and there are 4,360,000 cubic yards of concrete in the dam, powerplant and related works. Reclamation's facts and figures page records that the first concrete went in on June 6, 1933, and the last on May 29, 1935. President Franklin D. Roosevelt dedicated the dam on September 30, 1935.

The Hoover Dam bypass bridge arching over Black Canyon, with the dam's downstream face and powerplant below
The bypass bridge arching over Black Canyon, with the dam's downstream face and powerplant below (July 2010). Credit: Photo: Alexander Stephens, Bureau of Reclamation, via Wikimedia Commons. Public domain Image source

The powerplant has a nameplate capacity of 2,074,000 kilowatts. Inside the dam, huge steel pipes called penstocks carry water through lit tunnels.

A huge steel penstock running through a lit tunnel inside Hoover Dam
A steel penstock, a huge water pipe, runs through a lit tunnel inside Hoover Dam (August 2014). Credit: Photo: Jill Vanc, via Wikimedia Commons. CC BY-SA 3.0 Image source Image license

How low is Lake Mead?

Lake Mead's water level is the other story at the dam. The high-water line is 1,229 feet above sea level. Reclamation's end-of-month elevation table shows the lake at 1,196.12 feet at the end of December 2000, 1,086.30 feet in December 2010 and 1,083.72 feet in December 2020. It dipped to 1,040.92 feet in July 2022 and ended 2025 at 1,062.24 feet.

The latest month listed is September 2026, at 1,037.80 feet. That is about 158 feet lower than December 2000, and lower than July 2022.

Lake Mead's water level since 2000

Lake Mead's elevation at the end of each December, with the latest month, September 2026, highlighted.

Line chart of Lake Mead's end-of-December elevation in feet. It falls from 1,196.12 in 2000 to 1,086.30 in 2010, 1,083.72 in 2020 and 1,062.24 in 2025, with September 2026 at 1,037.80.
Show the numbers
YearElevation (feet)
20001196.1 ft
20011177.4 ft
20021152.1 ft
20031139.1 ft
20041130.0 ft
20051137.5 ft
20061128.1 ft
20071114.8 ft
20081111.0 ft
20091096.3 ft
20101086.3 ft
20111132.8 ft
20121120.4 ft
20131106.7 ft
20141087.8 ft
20151080.9 ft
20161080.8 ft
20171082.5 ft
20181081.5 ft
20191090.5 ft
20201083.7 ft
20211066.4 ft
20221044.8 ft
20231068.2 ft
20241063.3 ft
20251062.2 ft
Sep 20261037.8 ft
End-of-December elevation each year, plus September 2026. The high-water line is 1,229 ft. Source: Bureau of Reclamation, checked October 31, 2026. Chart: Places.vegas.
Pale mineral bands on the canyon walls above Lake Mead near Hoover Dam
Pale mineral bands on the canyon walls above Lake Mead near the dam show how far the water has dropped (April 2018). Credit: Photo: Agnieszka Kwiecien, via Wikimedia Commons. CC BY-SA 4.0 Image source Image license

If you also plan to visit Lake Mead National Recreation Area itself, it is open 24 hours a day, 7 days a week. Its entrance stations charge $25 per private vehicle, $15 per person or $45 for an annual pass, according to the National Park Service fee page.

Add Boulder City

You drive through Boulder City on the way, so it is an easy stop on the way back. The Boulder City/Hoover Dam Museum is at 1305 Arizona Street, open every day 7 a.m. to 7 p.m., and free. Check the museum's website before you go. Hoover Dam Lodge is another nearby stop on the map below.

When to go

The Visitor Center is closed on Thanksgiving and Christmas Day. Activities at the dam may be limited for two weeks before and after Easter, typically the first two weeks of August, three days after Thanksgiving, and from the week after Christmas through the first Monday of the new year. Holiday and summer travel can also bring delays on the road in.

For the season-by-season picture of the city, see our best time to visit Las Vegas guide. To fit the dam into a longer stay, try our 3-day Las Vegas itinerary. For another half-day escape, read our Red Rock Canyon guide.

See these places on the map

How far is Hoover Dam from Las Vegas?

Hoover Dam is 30 miles southeast of Las Vegas, reached through Boulder City and then NV-172.

How much are Hoover Dam tour tickets?

The Self-Guided Visitor Center Tour is $15 per person. The Guided Power Plant Tour is $25 for adults and $15 for ages 4 to 16. The Guided Dam Tour is $40 per person. Children 3 and under are free on all three.

Can you buy Guided Dam Tour tickets online?

No. Guided Dam Tour tickets are sold on site only, in person, first come first served. Visitor Center and Power Plant tickets are sold online and can be upgraded on site.

How much is Hoover Dam parking?

The Nevada-side garage near the Visitor Center is $10 per vehicle. RVs, trailers and oversized vehicles park on the Arizona side, where Lot 9 is $10 and Lots 13 and 14 are free.

What can you not bring to Hoover Dam?

Firearms, explosives, fireworks, drones and marijuana are prohibited, and knives of any size are not allowed inside buildings.

See these places on the map

Sources & checks

  • Hoover Dam

    Online tour ticket button showing as currently unavailable; activities may be limited 2 weeks before and after Easter, typically the first 2 weeks of August, 3 days after Thanksgiving, and from the week after Christmas through the first Monday of the new year; not all vehicles may cross the dam; vehicle and pedestrian traffic crosses the top of the dam.

    Checked
  • Hoover Dam Tour Information

    Guided Dam Tour $40, sold on site only; Guided Power Plant Tour $25 adults, $15 ages 4 to 16; Self-Guided Visitor Center Tour $15; 3 and under free; over 16 to tour alone; site open daily 5 a.m. to 9 p.m. Pacific; Visitor Center daily 9 a.m. to 5 p.m., doors close 4:15 p.m., last tour 4:10 p.m.; closed Thanksgiving and Christmas Day; prohibited items; parking $10 and Arizona-side lots.

    Checked
  • Directions to Hoover Dam

    30 miles southeast of Las Vegas; route via Boulder City, Exit 2, NV-172; Nevada-side garage $10 per vehicle; RVs, trailers and oversized vehicles on the Arizona side (Lot 9 $10, Lots 13 and 14 free); delays in holiday and summer travel; security screening at the Visitor Center; Mike O'Callaghan-Pat Tillman Memorial Bridge into Arizona.

    Checked
  • The Colorado River and Hoover Dam Facts and Figures

    726.4 feet from foundation rock to the roadway on the crest; 4,360,000 cubic yards of concrete; first concrete June 6, 1933, last May 29, 1935; dedicated September 30, 1935; nameplate capacity 2,074,000 kilowatts; Lake Mead high-water line 1,229 feet above sea level.

    Checked
  • Lake Mead at Hoover Dam, End of Month Elevation (Feet)

    End-of-month elevations: December 2000 1,196.12 ft; December 2010 1,086.30; December 2020 1,083.72; July 2022 1,040.92; December 2022 1,044.82; December 2025 1,062.24; September 2026 1,037.80 (latest month).

    Checked
  • Fees, Lake Mead NRA

    Private vehicle $25, per person $15, annual pass $45 at Lake Mead NRA entrance stations.

    Checked
  • Lake Mead NRA hours

    Lake Mead National Recreation Area is open 24 hours a day, 7 days a week.

    Checked
  • Boulder City/Hoover Dam Museum

    1305 Arizona Street, Boulder City; open every day 7 a.m. to 7 p.m.; free admission.

    Checked

More visitor guides

Related stories